Deprecated: Required parameter $partial_post_id follows optional parameter $next_style_ref in /home/launchnsel/public_html/wp/wp-content/plugins/colibri-page-builder-pro/extend-builder/data/import.php on line 189
Testing of Seaport Bumper – Newmark Structural Engineering Laboratory

The objective of this testing was to determine the performance of scaled (reduced size) bumper used at docks of seaports. Testing of full size bumper was performed using 3 million lbf capacity testing frame located in Talbot Laboratory at the UIUC.

Tags

Comments are closed