Deprecated: Required parameter $partial_post_id follows optional parameter $next_style_ref in /home/launchnsel/public_html/wp/wp-content/plugins/colibri-page-builder-pro/extend-builder/data/import.php on line 189
IDOT Bridge Beam Test – Newmark Structural Engineering Laboratory

3-Point Bending Test of Bridge Beam

The objective of this test was to determine the strength of concrete beam removed from a bridge built 60 years ago. This project is a part of Illinois Program to rebuild the state infrastructure. Click here to see the presentation of Tom GOLECKI , the student in charge of the testing.

Tags

Comments are closed